2023 Annual Project Manager Report
Reserve Number Updates
It is a continuous processs to make sure that we are working with current costs associated with materials and labor needed to repair or replace items needed throughout the community. I have been building relationships with contractors to attempt to bring costs down and retain our reserve account. As always, budgeting for these future projects, we require the most up to date information moving forward as the age of the community brings up aging equipment and facilities. The Garbage Contract I saved you $6,642, Changing Phone companies this past month will saved you over $2,000/yr, Fixed/replaced boiler flue piping and caps on the high-rises and saved $7,000 from being creative, to just name a few.
Saved over $15,600+ on just those 3 contracts
Building Foundations/Crawl Space Reports
We have been working diligently during this past year and a half to make sure that all of the items on the structural engineers lists were completed to the specifications laid out for our contractor. All of that work has been completed. I also walked almost all of the 60 - Garden level units of the low-rises to look for interior structural issues that may have been happening throughout the years. With detailed discriptions and in conjunction with the crawl space reports, I was able to come up with a work list for immediate and future repairs to make sure that we are managing all signs of structural movement. We recently went into 4 units to add 10 tie backs/wall anchors total to these units to assist in maintaining the structural integrity. With these reports we can better track any future issues or signs of issues. We are getting Summary Reports finalized to add to our website for everyone to view and reference.
Saved 10's of 1,000's of $$ with just the walk through analysis alone
Parking Lots
We opted for ashpalt patching this Summer to build up some reserve money for higher priority projects. We understand that we are in need of better stripping and numbers again but it will need to wait until we can figure out the replacement schedule for the asphalt.
Gym Remodel & New Equipment
We were able to expand even further by utilizing the backroom area for lane workouts and create better air flow. We took that wall out , added some railings, finished the painting scheme throughout. Also, I was able to find some exercise equipment very cheaply to add to the mix for a wider variety of exercises. The leg press machine was the highlight of equipment needed.
Saved over $8,000
Water Main Repairs
We have had more water main breaks throughout the community. Due to the old piping, my goal is to stay ahead of these issues by staying with my pro-active approach. I had all of the main lines and sewer pipes scoped and video cameraed to work on problem areas before they become large problems. So far in a couple of buildings, we have added some new plumbing clean outs, scrapped the inside of the pipes, added a liner (or new pipe internally) that extended to the main pipe throughout the community. This will add many years of life to those old areas. I also had locates done with GPS for all of the grounds water main piping to assist with locating pipes faster and having knowledge for future work or repairs.
Security
I have found a great contact at Xcel who has been working with me to slowly replace the old light pole fixtures with L.E.D. lighting to supply bettr lighting to the parking lots. I am still working to get more poles added. This past Summer we added "EXIT" signs and Flood lighting to the low-rise buildings that were having issues when we had power outages from storms, etc. In the clubhouse and gym buildings, we upgraded some of the older equipment with newer cameras, WiFi jumpers for the gym, and added security for those two buildings. We also changed out the old card reader system for a magnetic card/fob system. This will assist us in understanding residents usages, cut down on entry issues, and provide a safer environment without unwanted guests in the facilities.
Saved over $12,000 from other companies with the EXIT lighting and $3,500 for the entryway system on the gym. We own the equipment and no monthly fees of $100- $200/ mo for online support that we don't need.